Realisation Document
You prove that each requirement in your Design Document is engineered and works. For every MUST requirement you show how you built it, evidence a classmate can open, what happened when someone used it, and the test result. This product maps to the learning outcome Design & Realise.
A complete Realisation Document follows the requirement IDs from the design. The Design Document states what the end user needs from the product, and this document shows that you built those requirements. Update the proof when the build changes. Keep the story short: how it is built, what to look at, and what the test did.
Use the same knowledge your challenge lists. That is the method behind the proof, together with the city Requirements.
Embedded, when your challenge points there:
- Sketch structure and timing, sensors and actuators together, components
- Testing and debugging on hardware
Full-stack, when your challenge points there:
Quality indicators
When assessing this product, the following quality indicators are used:
- The Realisation Document follows on from your research and advice, through the Design Document: each proof matches a requirement you set there.
- Every MUST requirement appears with Built YES or NO, how you engineered it, and evidence a classmate can open.
- The evidence matches the requirement sentence (photo, snippet, log, API response, or numbered demo step).
- You showed working behaviour to at least one person in a user role and recorded what you changed, with the requirement ID. The quality guide states when your level expects a second perspective.
- Tests state how you ran them, what you expected, what happened, and the fix when a test failed.
- Requirements that come from the end user are proven in the build.
- Known limits are stated in a short list.
- Challenge evidence (repository, demo, photo, or deploy URL) points at requirement IDs.
Template
Copy the template and replace the examples. Use the same IDs as your Design Document.
Embedded (traffic light, RQ-01). Built: YES. In state IDLE, every approach is set to red. Debounce is 200 ms, from sketch structure and timing. Evidence: Serial log IDLE A=RED B=RED and a photo of the tile. A classmate in the role of a road user asked for yellow before red; you added that transition and retested.
Full-stack (dashboard, RQ-01). Built: YES. The API returns lastSeen. The UI shows stale when now - lastSeen is over 30 seconds, from your fail-state requirement. Evidence: simulator stopped, screenshot of the stale state, and the response JSON. Check: stop the publisher, wait, refresh from another device on the city Pi.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 | |